Pre-analysis plan: Employee engagement at work
Instrument: Employee engagement at work
Authors: Demo author
Version: 1.0.0
Date: 16 November 2026
Instrument hash (SHA-256):
4b6fcc73ca2bd9a0762fa4eab731c8c318b94ee0831e1b3a7a1262aa77ce8dff
The hash identifies the instrument file this plan describes. Anyone can check that a .sframe file is the one planned by opening it at https://surveyframe.org/verify or with read_sframe() in R.
Study
Purpose: An employee engagement survey of 8 items, written to measure 2 things employees judge: how their work is organised, and the content of their work.
Research problem: An organisation’s engagement survey assumes 2 dimensions, and it needs to check that its employees’ answers support that before reporting 2 scores.
| Objective | Research questions |
|---|---|
| O1: Check that the data are suitable for factor analysis. | RQ1 (Is this data suitable for factor analysis?) |
| O2: Find how many factors the items form, and which items load where. | RQ2 (How many factors, and which items load where?) |
Population: Employees of one organisation
Sampling method: census
Planned sample size: 200
Participant information
Welcome title: Employee engagement at work
Introduction: Thank you for taking part. This survey takes a few minutes.
Consent (required to start): I agree to take part, and for my answers to be used for this study.
Thank-you message: Thank you for completing this survey.
The questionnaire
The questions in the order respondents see them.
- My work is planned well in advance. (Rating scale). Options: Strongly disagree, Disagree, Neither agree nor disagree, Agree, Strongly agree.
- I know where to find what I need to do my job. (Rating scale). Options: Strongly disagree, Disagree, Neither agree nor disagree, Agree, Strongly agree.
- My manager helps when I have a question. (Rating scale). Options: Strongly disagree, Disagree, Neither agree nor disagree, Agree, Strongly agree.
- My workplace suits the work I do. (Rating scale). Options: Strongly disagree, Disagree, Neither agree nor disagree, Agree, Strongly agree.
- My work is relevant to my goals. (Rating scale). Options: Strongly disagree, Disagree, Neither agree nor disagree, Agree, Strongly agree.
- My work challenges me enough. (Rating scale). Options: Strongly disagree, Disagree, Neither agree nor disagree, Agree, Strongly agree.
- The people I work with know their subject. (Rating scale). Options: Strongly disagree, Disagree, Neither agree nor disagree, Agree, Strongly agree.
- The tools I am given are useful. (Rating scale). Options: Strongly disagree, Disagree, Neither agree nor disagree, Agree, Strongly agree.
Scales and scoring
| Scale | Items | Reversed | Score | Missing answers |
|---|---|---|---|---|
| How my work is organised (organisation) | org_1, org_2, org_3, org_4 | none | mean | all 4 items needed |
| The content of my work (content) | con_1, con_2, con_3, con_4 | none | mean | all 4 items needed |
Pre-declared analysis plan
RQ1: Is this data suitable for factor analysis?
Planned decision rule: Proceed when KMO is .60 or above and Bartlett’s test has p < .05.
Method: Factorability checks (KMO and Bartlett’s test)
Variables: org_1, org_2, org_3, org_4, con_1, con_2, con_3, con_4
RQ2: How many factors, and which items load where?
Planned decision rule: Retain the factors parallel analysis supports, and read loadings of .40 or above.
Method: Exploratory factor analysis
Variables: org_1, org_2, org_3, org_4, con_1, con_2, con_3, con_4
Amendments
None. This is the instrument as first planned.
References
- R Core Team. (2026). R: A language and environment for statistical computing. R Foundation for Statistical Computing.
- Sharafuddin, M. A. (2026). surveyframe: Design, Plan, Seal and Report Questionnaire Studies (Version 0.4.3) [Computer software]. https://github.com/MohammedAliSharafuddin/surveyframe
To complete before submission
A preregistration also asks for these. Write each answer on its line before you submit the plan, or add it to the instrument’s study.
Exclusion rules: which responses will be excluded, and why.
________________________________________
Stopping rule: when data collection ends: a date, a sample size or another rule.
________________________________________
Primary outcomes: the outcomes that answer the main question.
________________________________________
Secondary outcomes: the secondary outcomes.
________________________________________
Multiplicity: how the tests are corrected for being run together, if at all.
________________________________________
Contingency decisions: what you will do if an assumption fails or the planned sample is not reached.
________________________________________
Significance level: the alpha each test is judged against.
________________________________________